Started on the garage project.
I really wanted to just pour overtop existing concrete. I need to raise up floor to have better surrounding drainage. But after pulling some broken areas up found that base is crap and concrete varies from 1" to about 6". And that's not at edges but all over. Part of trying to keep expense down I'm doing the floor demo and slider door along with overhead door. Had some guys call and they need the work so might be getting underway within the week.