Hi All
The transport manager (me) has reported to the owner (me) that the engineer (me) needs to urgently provide more pallets for distribution of freight and construction items as at the last job (club meet) there was a short fall quotas were not reached.
With this in mind as you can see it all falls to me the printer is on over time producing more pallets.
They have also put a requisition in for the loading bay and office lighting as not being able to work at night is causing operation issues.
Thus me (the designer) general get it all done guy) will have to design and produce some lights soon.
Well that's 8 more ready for assembly and more in production.