Some more work done on the excavator - working on the linkages from the cylinder to the bucket. The side links were milled from flat bar stock on the rotary table:
The solid link from there to the bucket is being pieced up from a thicker piece of flat bar and two round bars with slots milled in. They will be silver soldered together and then more shaping done.