It really does work slick Emil, carries a lot of dirt, then roll the blade back a wee bit to empty & pack at the same time.
Start of the 3rd cut today
1,5 hr later
It’ll take about half hour to shape both ends with the ScaleArt loader with u-blade for trk entry. And another hour outside with the dozer leveling what I spread.