Re: Barge-Mounted Clamshell Crane
I should have done this before:
------LEFT STICK--------------------------------RIGHT STICK
------boom down---------------------------------hoist down
swing left-----swing right-----------------bucket close---bucket open
--------boom up------------------------------------hoist up
My hoists are set up opposite of yours because on every machine I've ever run if you want something to go up you pull back and forward to go down so that's the way I think. I never thought about locking out the boom hoist but I'd love to be able to do that. I'll have to see if my radio can do that.
|