Re: Barge-Mounted Clamshell Crane
Seems like I heard the reason for that, at least on the big draglines anyways was so you could push/pull both levers in the same direction when the bucket was moving away or towards the machine. Somewhere on Youtube a dragline operator was explaining why that was but I can't remember what or whose video it was. I figured on the small machines that's just the way the control linkages worked out. I wonder if the BEs with air controls are the same way?
|