Re: Mack M75SX
thanks Dan , both sides . The initial op (1 side ) was 8 hrs on the flip over just shy of 3 hrs to mill between the flanges . I have about 24 hrs with a set of trailer frames and the 2nd mack frame and the walking beams . All out of 1 piece of plate .
__________________
RIP FreddyGearDrive 2-12-59/12-19-11
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
|