Re: A KISS D11 PROJECT
Thanks, td9 and Neil I've been working on the tracks a while now and your right about being somewhat difcult.there a time comsumer ,I've been putting a radius on the links for the grouser pads and have enough links now for about 12' of track.was wondering about how to lock the ends of the 10/24 threads either with single nut and spot of weld or double nut or just add nylon locknut ?thinking out loud.Tom
|