View Single Post
  #280  
Old 01-07-2013, 08:50 AM
D8R D8R is offline
Apprentice
 
Join Date: Sep 2010
Location: Ronninge, south of Stockholm, Sweden
Posts: 425
D8R is on a distinguished road
Default Re: D8R +463 in 1/5,6

Pin puller assembly done (except for pins instead of bolts)
CAD model:

and how it turned out:


Do not have room for any more hydraulics so it has a spring loaded cylinder.
Testing doing videos with the dozer cam, see here:
www.youtube.com/watch?v=TsZIEjif7eM

Spacers inside ripper assembly (where tooth will be) will be milled in alu and bolted in place. Not shure how tight/loose the ripper should be, some movement needed for shure. Will get alu tomorrow, pics coming.
Have a nice monday night!
Dan
Reply With Quote