Thread: CAT 374D L
View Single Post
  #8  
Old 04-20-2012, 06:03 AM
Hemi1966 Hemi1966 is offline
Journeyman
 
Join Date: Aug 2010
Location: Finland
Posts: 641
Hemi1966 is on a distinguished road
Default Re: CAT 374D L

Quote:
Originally Posted by RCP57 View Post
How long does it take to machine a pad and link?

Reg
It takes about 25 minutes to make one link pair and pad I have only made two of them, and it just hit me that making the rest 100 pcs will take very long time
__________________
Ari


To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Reply With Quote