View Single Post
  #38  
Old 06-28-2013, 07:15 PM
Rvjimd's Avatar
Rvjimd Rvjimd is offline
Craftsman
 
Join Date: Dec 2012
Location: Des Moines, Iowa
Posts: 884
Rvjimd is on a distinguished road
Default Re: Barge Unloading Facility Build

Tom,

I was wrong on the times. Loaded 1.5 barges today using the new winch, conveyor and dragline.

It must have been 30 minutes to load one with out the conveyor, the new time for one is 20. I gain a bit by not having to swing 180 with every lift.

Need to get back on the screen separator and u loading dock, and gantry crane using the clam bucket.

Better get to work!

Jim
Reply With Quote