View Single Post
  #68  
Old 01-22-2014, 12:34 AM
Lil Giants's Avatar
Lil Giants Lil Giants is offline
BANNED
 
Join Date: Aug 2010
Location: Saskatchewan
Posts: 4,431
Lil Giants has disabled reputation
Default Re: New member. Building D8

Here's Fumotec's PDF of his track hoe, scroll down to pg17 for the hyd system installation. It's the same system that Premacon assembles to sell as a kit.

http://www.fumotec.de/downloads/koma...tung-klein.pdf

Your pressure line on one side of the valve & the pressure relief valve on the direct opposite side. The other two ports should be plumbed back to the oil tank with inline filters. The one returning oil line will be Y'd to the prv.

Fumotec uses fuel tanks from helicopters (he is afterall an employee of Vario Helicopters) for oil reservoirs. Your dozer wouldn't need a tank capacity of any more than 250ml or so.

That Jung pump is capable of putting out 100bar (1400psi), so when you deadend the cyl stroke & the oil has no where else to go, the pressure line will explode in an instant! I hope you're wearing eye protection when you're messing this stuff?!
__________________
Sharing knowledge is one thing that defies basic arithmetic logic --- the more you share, the more you get!

Joe
Reply With Quote