Thanks for the compliments guys,
The sub assemblies will be pinned or just a tight fit. The swing bearing will be glued into the house once the metal work is finished as a c-clip holds it to the gear assembly on the track frame. Most of the body will just lift off to access the guts when needed and I plan to hinge the engine cover for battery changes. I will leave enough space near the side cut outs to run a cooling fan if needed as well.
Everything is TIG welded Chris.
Thanks for checking out my progress!
Oh yeah, The shop is nice and warm Rob, I'm just non-union
Reg