![]() |
|
Get it out of your system! HERE! You have a gripe,bone to pick, Tamiya vs Wedico or just have to let it out! THIS IS THE ONLY PLACE TO DO IT! |
![]() |
|
Thread Tools | Display Modes |
#1
|
||||
|
||||
![]()
Well to say the least today was just bad ontop of more bad for me
![]() ![]() ![]() ![]() by now i was starting to get sloppy in my work because i was so angry but i had to keep goin since i dont have a whole lot of time left to work on it. And now for the finale to my terrible build day. i was doing a little bit of structual soldering with some brass tubing and because it was with large tubing it retains heat for a while before cooling down cold enough to hold. I somehow forgot this and picked up a piece and burt off about 3 of my finger prints... well that todays rant. hopefully tomorrow goes better ![]() Thanks, Chris |
#2
|
||||
|
||||
![]()
Sounds like just another day at the office
![]() ![]()
__________________
LYNN |
#3
|
|||
|
|||
![]()
hehe boy i can relate when i had my own business and i had days like that i usually just told my customer see ya tomorrow! then just pack my toys up and head to the house
|
#4
|
||||
|
||||
![]()
well i decied to take a complete break from it today, played with the highlift
![]() |
#5
|
|||
|
|||
![]()
very true they didn't build rome in a day and i shure didn't build a terex dozer in a day took 7 months to build and almost 2 years to finish it to make it move
__________________
I built this thing and have it working now what do I do with it? |
#6
|
|||
|
|||
![]()
I can totally appreciate this rant Chris. Good stuff. We've all been there. I've been running CNC milling jobs lately and some of these jobs run for 1 or 2 hours and require tool and setup changes in the final stages...which is ALWAYS when I make a mistake and ruin the part. Never happens in the first 5 minutes!! Joe
|
#7
|
||||
|
||||
![]() Quote:
![]() ![]()
__________________
RIP FreddyGearDrive 2-12-59/12-19-11 To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts. |
#8
|
||||
|
||||
![]()
Have you ever heard of a set-up piece
![]() ![]() ![]() ![]() ![]() Like I said, just another day at the office!! I do feel for you Chris. It has happened to me too many times to count.
__________________
LYNN |
#9
|
||||
|
||||
![]()
If in doubt pour a cold one and listen to this song
![]() http://www.youtube.com/user/Scentles...42/rUjFxgO4das |
#10
|
||||
|
||||
![]()
Well i waited a day and started fresh today with new material and it was a success! I had to make an electric actuator with 1.75" stroke. I measured everything, did it right the first time and when it was all assembled it worked perfectly! I'll try to take a picture tomorrow to show you guys what i made.
![]() SANDCRAFT TRANSPORT - yea i was running thin on patience that day hahaha. I geuss after 8 hours alone working in the shop with everything going wrong i got a little ancy. td9cycle - So far i think i've got easily 100 hours in the shop, probably half on my drill press/makeshift lathe/light duty home made milling machine ![]() Heavy Metal - Oh man! I think thats when i would just get extremely angry and walk out. 9W Monighan - Yeup thats usally the case, i get excited since its almost all done and overlook a step on the last piece and it all goes downhill from there. ![]() tc1cat - $12,000 dollars?!? What are you making? must be cool if its that pricey. Hahaha yes i've been there and done that. You always think it will work just barely, but in reality it won't, doesn't and ruines what you working on. Like when i was tapping the 10-24 thread the tap i had; snapped so i thought, "i'll just use half of it, it SHOULD work". Well lets just say the hole got ruined and the broken tap landed in the neighbors yard ![]() 9W Monighan - Yea i love Pink Floyd so i turn on some Dark Side of The Moon, lie down and relax. ![]() |
#11
|
||||
|
||||
![]()
My main 9 to 5 job is for an orthopaedics company. I make replacement hips, shoulders, and elbows. Mostly out of titanium or cobalt chrome. Been at it for almost 25 years. Most of my time is spent running a CNC lathe with live tooling- milling and drilling heads in turret. Lots of ops. done at the same time compared to 10 years ago.
__________________
LYNN |
#12
|
||||
|
||||
![]() Quote:
![]() ![]()
__________________
RIP FreddyGearDrive 2-12-59/12-19-11 To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts. |
#13
|
||||
|
||||
![]()
I think that that is most expensive hip we make. Most are a lot less. Hospital bill and surgeon's bill will make you cry. My knee op 3 weeks ago has a $11,000 hospital bill plus the surgeon's bill which I have no idea how much it will be. And this was out-patient surgury, in at 9AM out at 3PM. 2nd surgery yesterday for bladder stones was about the same for time in at 7AM out at noon. Can't wait to see that bill
![]() ![]() ![]()
__________________
LYNN |
#14
|
||||
|
||||
![]()
tc1cat - Oh cool so im geussing you machines have a 4th and 5 axis?
ihbuilder - how is your shop coming now? i remember talking to you a while ago about it on scale4x4 tc1cat - wow! im hoping i dont have any health issues with prices like that. Hope you get better and dont need any more surgeries! heres a picture of the actuator to show you guys what they look like: ![]() Chris |
#15
|
|||
|
|||
![]()
nice job on that actuator
__________________
I built this thing and have it working now what do I do with it? |
#16
|
||||
|
||||
![]()
Feeling much better now. Back to work tonight-3rd shift. CNC mill has 4th axis. Been running it for almost 25 yrs with the lathe added in for about 10 yrs.
__________________
LYNN |
#17
|
||||
|
||||
![]()
thanks! any pictures of the mill?
|
![]() |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
Thread Tools | |
Display Modes | |
|
|