![]() |
|
Big Boys of the road 4x4/6x6/8x8/10x10 Trucks This forum is for those multiple axle trucks and other vehicles on and off road. |
|
Thread Tools | Display Modes |
#29
|
||||
|
||||
![]()
The rebuilding is complete!
After I rearranged the carrier and made all functions (except for the outriggers) RC controllable, I started work on the upper. I was never happy with the upper and I decided to take all the motors out and replace them with new ones. I also changed the telescoping mechanism and installed the motor and spindle in the boom. That is a great improvement. The hoist also uses a spindle, but a better one than the old one. The counterweight has a motor inside and this way it can attach itself to the upper. All together there are 6 functions. Since I have only 4 feeds I had to add 2 switches on the upper. With all these changes I gained a lot of space and there was ample space for a battery for the carrier. It connects with a plugin cable. With all this rebuilding I tried not change the parts that worked well. I am pretty happy with the result, although some painting is needed, The motor compartment of the truck: ![]() The new swing motor and the 2 motors for the winches. ![]() The boom hoist ![]() Here a comparison of the old and the new. ![]() The other side. Lots of electric connectors. The battery is connected via this little storage box next to the hoist cylinder. ![]() Kerst |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|