![]() |
|
Construction Equipment Tech Hydraulics, Electronics, General Engineering, ect in constr equip |
|
Thread Tools | Display Modes |
#7
|
|||
|
|||
![]()
I went with the 2X25 dual drive sabertooth. Only issue I had was to fit the sabertooth flush and level in the electronics bay I had to machine some material out of the bulkhead
nearest the main boom to allow the width of the sabertooth. Other than that, it was plug and play and working great. |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
Thread Tools | |
Display Modes | |
|
|