RC Truck and Construction  

Go Back   RC Truck and Construction > RC Truck's Ag and Industrial Equipment and Buildings > Construction Equipment > Construction Companies & Worksites


Reply
 
Thread Tools Display Modes
  #1  
Old 04-06-2015, 01:16 PM
Cooper's Avatar
Cooper Cooper is offline
Big Dawg On The Bone
 
Join Date: Oct 2013
Location: Watsontown, Pa
Posts: 2,119
Cooper is on a distinguished road
Default Re: Jobs Projects n Site Ideas

My original dig site was removing a backyard koi pond. Now that has become an open pit mine. Future plans are to remove a 36" old tree stump. It has been cut down about 3 years ago and some backyard root rot was drilled into stump. I have to extend fence to be able to make it a full fledged dig site. I imagine this project will take most of this summer. I figure most of the hair roots and some of the finger roots are rotten enough to dig, if not I'll have some snips around when enough dirt is removed. I think the complete dig site will be about a ten foot circle and might go down 2 1/2 - 3'. Depending on soil, it should be a sandy based soil like most around here. That should keep me busy for a while.
__________________
Always wasting money, as the wife says.
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Reply With Quote
  #2  
Old 04-06-2015, 01:22 PM
JDH429's Avatar
JDH429 JDH429 is offline
Wannabe
 
Join Date: Feb 2013
Location: Cleveland
Posts: 394
JDH429 is on a distinguished road
Default Re: Jobs Projects n Site Ideas

Quote:
Originally Posted by Cooper View Post
My original dig site was removing a backyard koi pond. Now that has become an open pit mine. Future plans are to remove a 36" old tree stump. It has been cut down about 3 years ago and some backyard root rot was drilled into stump. I have to extend fence to be able to make it a full fledged dig site. I imagine this project will take most of this summer. I figure most of the hair roots and some of the finger roots are rotten enough to dig, if not I'll have some snips around when enough dirt is removed. I think the complete dig site will be about a ten foot circle and might go down 2 1/2 - 3'. Depending on soil, it should be a sandy based soil like most around here. That should keep me busy for a while.
That sounds like a project for sure, Do you think there will be any issue with water standing in the bottom of the pit? Could be like an abandoned quarry that hit a spring. Haha. Do you plan to spiral the haul road down the hole? Maybe 2-3' you might get away with a straight ramp in and out, but that may not be as fun.
__________________
Jason
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 01:58 AM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.