![]() |
|
#10
|
||||||
|
||||||
|
Quote:
sometimes a guy gets lucky. Quote:
. Finally got the cash to deal with my border woes, just won't be done in time for this Aug![]() Looking forward to seeing you again next year! Lots to show and talk about since the last time we met ![]() Quote:
It was quicker, cheaper and less complex to build the shaker and then add the conveyor. It's all about personal preference and needs I guess. A portable trommel like Lou's is more site flexible, my shaker is a very site specific set up but I have the space for it so,it's all good! ![]() Quote:
![]() Quote:
I like the exterior plywood idea but hard to get thin and cheap. i live in steel town so hoping to find a sheet of something I'll never have to worry about for the rest of my life anyway. Quote:
![]() Next is another conveyor.... 4ft . Used to stock pile dirt from the pit before going through the shaker. i also need to make my first attempt at a scale building. I want to make a shaker operator shack which will have the 3 ESC's , RX and battery inside and will run the whole operation from a 6ch radio...... Yes , I don't need 6 channels but I have ideas for the spare channels... ..... I'm thinking I could run my 3 lighting plants I got from exclusive rc through the radio maybe and control lighting from the radio also ? ![]()
|
| Currently Active Users Viewing This Thread: 227 (0 members and 227 guests) | |
| Thread Tools | |
| Display Modes | |
|
|