Fixed the link.
When reposting links from a forum post, the forum software seems to automatically shorten the link. So if you wish to copy & paste the same link elsewhere, then you must click the link to bring up the website & then copy the link from the website.
I didn't notice that pic of the hyd schematic at the very end, that sums it pretty well. The Vario schematic had the pressure guage between pump & valve, and even Leimbach's hyd system is done that way too for a guage. Installing the guage either side of the valve before the PRV is fine I guess, however best it fits within your model for easy viewing.
Quote:
Originally Posted by Fired up
thanks for the help Joe.
|
You're welcome. "....teach a person to fish..."