Quote:
Originally Posted by andyathome
nice conveyor, have you thought about gluing some teeth to the belt to allow you to have a higher incline if need be.
I found on mine (4 feet long)about 15 degrees was the max before the rocks started to roll down hill, also if I slowed it down you can go a little steeper.
cheers andy
|
I'm maxing incline out at 70~ or 20 degrees whichever 90 is. Scale wise the pile should have a max height of 25' and a base of around 60-70'. For what I have planned it wouldn't be a max elevation. More for transferring material. What I really need is about six of these lined up for moving material. If this one works out I may built two more for quick transfer of material. I'm planning on spreading cracker dust/ screenings under my deck. And deck is 14x 40'. Lots of work for the perfect sized "toys"

under the deck with height of about two feet.