![]() |
|
|||||||
| Construction Equipment If it digs, pushes, hauls dirt "off road" post it here. |
![]() |
|
|
Thread Tools | Display Modes |
|
|
|
#1
|
||||
|
||||
|
Been working very slow lately. Thought I'd post a couple from this week.
Setting up boom to mill the chords to proper length ![]() Now I need to make plates and attach to the ends so the channel that holds the front pillow block on can be mounted. That wood block I used temporally for the point sheave came in handy to hold everything in alignment. ![]() I miscounted the quantity of 1.25'' sheaves needed. I still need about 5 more and 4- 1''dia. This is the first side then I will flip them over locate to one of the holes and continue milling the pockets.
|
|
#2
|
||||
|
||||
|
Looking good Steve
See that you are running production on the sheaves. You are going fast. Eef |
|
#3
|
|||
|
|||
|
Interesting clamp configuration
.Did you turn the small sheaves manually or via cnc? BTW: did you get my last pm? |
![]() |
| Currently Active Users Viewing This Thread: 4 (0 members and 4 guests) | |
|
|