![]() |
|
|||||||
| Construction Equipment If it digs, pushes, hauls dirt "off road" post it here. |
![]() |
|
|
Thread Tools | Display Modes |
|
|
|
#1
|
||||
|
||||
|
Eef, I want to get these done. I want to move on to other things on the boom. Pretty boring on the milling operation. It takes 9min.ea to drill the 6 holes and pocket the spokes for the 24pcs. This evening I'm going to program the other side.Probably take close to 15min. each. I could probably go faster but risk breaking my 3/32''carbide endmill. I still need 6 more sheaves that are different size.
Lorenzo, I made each one on my lathe manually:bore,groove,part off, face to thickness. |
|
#2
|
|||
|
|||
|
Oh, very time consuming and boring work. I don't really like those kind of work.
But never the less they look like if they are done by cnc. Keep up the good work. |
|
#3
|
||||
|
||||
|
Finally got this set done. This is enough to reeve the boom but I still need a a couple smaller to run down to the boom hoist.
![]() Collet fixture to hold in mill ![]() view showing groove for 1/16'' cable
|
![]() |
| Currently Active Users Viewing This Thread: 7 (0 members and 7 guests) | |
|
|